Karl A L Smith

human knowledge belongs to the world

AI Cost Overruns

Why AI Organisational Design Is Not Optional

The Case for AI Organisational Design: Why This Sector Is Not Optional There is a growing perception that proposing work in AI Organisational Design is premature, as if the sector does not yet exist. But the absence of a formalised…